ASTQB Certified Tester Foundation Level: Quizzes

Quiz No. 20

Syllabus 2018

ASTQB Certified Tester Foundation Level: Quiz No. 20

QUESTIONS

Q-1. Which of the following is a way that test levels are stated? Select all that apply.

a. Test object.

b. Test target.

c. Testing objective.

d. All of the above.

e. None of the above.


Q-2. Which of the following is the test target of integration testing? Select all that apply.

a. Physical design.

b. Logical design.

c. Both a. and b.

d. Neither a. nor b.


Q-3. Which of the following is a characteristic of a tester’s mindset that impacts the success of the test effort? Select all that apply.

a. Team members recognize the importance of a tester’s independence.

b. Team members recognize the importance of feedback to successful collaboration.

c. Team members are willing to align objectives with those of the organization.

d. All of the above.

e. None of the above.


Q-4. Which of the following is the test target of system testing? Select all that apply.

a. Physical design.

b. Logical design.

c. Both a. and b.

d. Neither a. nor b.


Q-5. Assuring that a product will operate without failure during its life cycle is referred to as________________. Select all that apply.

a. Operational testing.

b. Reliability testing.

c. Regression testing.

d. None of the above.


Q-6. True or False: A review team may perform one or more types of reviews to evaluate one work product.

a. True.

b. False.

Q-7. Which of the following is a main activity of a formal review?

a. Planning.

b. Evaluate review results.

c. Document review results.

d. All the above.

e. None of the above.

Q-8. Which of the following is a task performed by a review’s moderator during a review’s planning stage?

a. Defines entry and exit criteria.

b. Specifies the review roles.

c. Records issues with the document under test.

d. All of the above.

e. None of the above.

Q-9. Use checklists to evaluate the document under review and making note of spelling defects are activities of a review’s_____________.

a. Review participant.

b. Moderator.

c. Scribe.

d. All of the above.

e. None of the above.

Q-10. Identify a valid responsibility of a team role for a review.

a. Confirm a solution’s design complies with documented requirements.

b. Confirm the content of the document under review is unlike that of supporting documents.

c. Confirm the solution represented in the document under review fulfills project objectives.

d. All of the above.

e. None of the above.


Q-11. Which of the following metrics pertain to the execution of test cases? Select all that apply.

a. Defect density.

b. Testing costs to date.

c. Test coverage of risks.

Q-12. What criteria allows for the initiation of acceptance testing? Select all that apply.

a. The test effort has provided sufficient coverage of requirements of the functions of the work product under test.

b. The system testing phase concluded successfully.

c. Bug tracking and test-tracking systems are in place.

d. All of the above.

e. None of the above.

Q-13. The __________ serves as the change authority for a development baseline. Select all that apply.

a. The development organization.

b. The test organization.

c. Either a. or b.

d. Neither a. nor b.

Q-14. Which of the following is a configuration management function? Select all that apply.

a. Confirming that a software product conforms to its requirements throughout the SDLC.

b. Evaluating and approving changes to a software program after its configuration identification is established.

c. Determines the approval authority for a change to a configuration item.

d. All of the above.

e. None of the above.

Q-15. Which of the following serves as exit criteria for a test project? Select all that apply.

a. Test cases have been executed.

b. The system testing phase concluded successfully.

c. The budget is depleted.

d. Identified bugs have been fixed and closed.

e. The system’s compatibility with hardware has been confirmed.


Q-16. What option can be used verify documentation against the software?

a. Test execution and logging tool.

b. Acceptance test-driven development tool.

c. Test coverage measurement tool.

d. All of the above.

e. None of the above.

Q-17. Which of the following is a true statement regarding the test comparator tool?

a. Stores outputs from software under test.

b. Compares data stores after the execution of tests.

c. Creates a production-like workload on a system under test and measures the system's response times under this load.

d. All of the above.

e. None of the above.

Q-18. What is used to detect memory leaks, resource leaks, pointer problems and other program vulnerabilities by which an attacker may gain unauthorized access to the system resource?

a. Dynamic analysis tool.

b. Static analysis tool.

d. All of the above.

d. None of the above.

QUESTIONS & ANSWERS

Q-1. Which of the following is a way that test levels are stated? Select all that apply.

a. Test object.

b. Test target.

c. Testing objective.

d. All of the above.

e. None of the above.

A-1: d. All of the above. (FL 1.1.1) (LO 1.2.1) (LO 1 Q-96)


Q-2. Which of the following is the test target of integration testing? Select all that apply.

a. Physical design.

b. Logical design.

c. Both a. and b.

d. Neither a. nor b.

A-2: a. Physical design. (FL 1.1.1) (LO 1.2.1) (FL 1 Q-97)


Q-3. Which of the following is a characteristic of a tester’s mindset that impacts the success of the test effort? Select all that apply.

a. Team members recognize the importance of a tester’s independence.

b. Team members recognize the importance of feedback to successful collaboration.

c. Team members are willing to align objectives with those of the organization.

d. All of the above.

e. None of the above.

A-3: a. Team members recognize the importance of a tester’s independence. (FL 1.5.2) (LO 1.5.2) (LO 1 Q-98)


Q-4. Which of the following is the test target of system testing? Select all that apply.

a. Physical design.

b. Logical design.

c. Both a. and b.

d. Neither a. nor b.

A-4: b. Logical design. (FL 1.1.1) (LO 1.2.1) (LO 1 Q-99)

Q-5. Assuring that a product will operate without failure during its life cycle is referred to as________________. Select all that apply.

a. Operational testing.

b. Reliability testing.

c. Regression testing.

d. None of the above.

A-5: b. Reliability testing. (FL 1.1.1) (LO 1.2.1) (LO 1 Q-100)


Q-6. True or False: A review team may perform one or more types of reviews to evaluate one work product.

a. True.

b. False.

A-6: a. True (FL 3.2.5) (LO 3.2.3) (LO 3 Q-96)

Q-7. Which of the following is a main activity of a formal review?

a. Planning.

b. Evaluate review results.

c. Document review results.

d. All the above.

e. None of the above.

A-7: a. Planning. and b. Evaluate review results. (FL 3.2.1) (LO 3.2.1) (LO 3 Q-97)

Q-8. Which of the following is a task performed by a review’s moderator during a review’s planning stage?

a. Defines entry and exit criteria.

b. Specifies the review roles.

c. Records issues with the document under test.

d. All of the above.

e. None of the above.

A-8: a. Defines entry and exit criteria. (FL 3.2.1) (LO 3.2.1) (LO 3 Q-98)

Q-9. Use checklists to evaluate the document under review and making note of spelling defects are activities of a review’s_____________.

a. Review participant.

b. Moderator.

c. Scribe.

d. All of the above.

e. None of the above.

A-9: a. Review participant. (FL 3.2.1) (LO 3.2.1) (LO 3 Q-99)

Q-10. Identify a valid responsibility of a team role for a review.

a. Confirm a solution’s design complies with documented requirements.

b. Confirm the content of the document under review is unlike that of supporting documents.

c. Confirm the solution represented in the document under review fulfills project objectives.

d. All of the above.

e. None of the above.

A-10: a. Confirm a solution’s design complies with documented requirements. and c. Confirm the solution represented in the document under review fulfills project objectives. (FL 3.2.1) (LO 3.2.1) (LO 3 Q-95)


Q-11. Which of the following metrics pertain to the execution of test cases? Select all that apply.

a. Defect density.

b. Testing costs to date.

c. Test coverage of risks.

A-11: a. Defect density . b. Testing costs to date, and c. Test coverage of risks. (FL 5.3.1) (LO 5.3.1) (LO 5 Q-96)

Q-12. What criteria allows for the initiation of acceptance testing? Select all that apply.

a. The test effort has provided sufficient coverage of requirements of the functions of the work product under test.

b. The system testing phase concluded successfully.

c. Bug tracking and test-tracking systems are in place.

d. All of the above.

e. None of the above.

A-12: b. The system testing phase concluded successfully. (FL 5.2.3) (LO 5.2.9) (LO 5 Q-97)

Q-13. The __________ serves as the change authority for a development baseline. Select all that apply.

a. The development organization.

b. The test organization.

c. Either a. or b.

d. Neither a. nor b.

A-13: c. Either a. or b.(FL 5.4.1) (LO 5.4.1) (LO 5 Q-98)

Q-14. Which of the following is a configuration management function? Select all that apply.

a. Confirming that a software product conforms to its requirements throughout the SDLC.

b. Evaluating and approving changes to a software program after its configuration identification is established.

c. Determines the approval authority for a change to a configuration item.

d. All of the above.

e. None of the above.

A-14: b. Evaluating and approving changes to a software program after its configuration identification is established. and c. Determines the approval authority for a change to a configuration item. (FL 5.4.1) (LO 5.4.1) (LO 5 Q-99)

Q-15. Which of the following serve as exit criteria for a test project? Select all that apply.

a. Test cases have been executed.

b. The system testing phase concluded successfully.

c. The budget is depleted.

d. Identified bugs have been fixed and closed.

e. The system’s compatibility with hardware has been confirmed.

A-15: a. Test cases have been executed. The budget is depleted. and d. Identified bugs have been fixed and closed.

(FL 5.2.3) (LO 5.2.9) (LO 5 Q-95)


Q-16. What option can be used verify documentation against the software?

a. Test execution and logging tool.

b. Acceptance test-driven development tool.

c. Test coverage measurement tool.

d. All of the above.

e. None of the above.

A-16: b. Acceptance test-driven development tool. (FL 6.1.1) (LO 6.1.1) (LO 6 Q-96)

Q-17. Which of the following is a true statement regarding the test comparator tool?

a. Stores outputs from software under test.

b. Compares data stores after the execution of tests.

c. Creates a production-like workload on a system under test and measures the system's response times under this load.

d. All of the above.

e. None of the above.

A-17: b. Compares data stores after the execution of tests. (FL 6.1.1) (LO 6.1.1) (LO 6 Q-97)

Q-18. What is used to Detects memory leaks, resource leaks, pointer problems and other program vulnerabilities by which an attacker may gain unauthorized access to the system resource?

a. Dynamic analysis tool.

b. Static analysis tool.

d. All of the above.

d. None of the above.

A-18: a. Dynamic analysis tool. (FL 6.1.1) (LO 6.1.1) (LO 6 Q-98)

Subscribe

ASTQB Quiz CENTRAL is not associated with either ASTQB.org or ISTQB.org.